The Arts building was built as part of a second phase to the original construction of the original campus buildings that were built in 1992.  This second phase added the Arts Building and Science Hall 2.  

The addition of the Arts building gave CSUSM the ability to provide Dance, Studio Art and Theater Arts spaces.

The addition of Science Hall 2 provided additional laboratories for Biology, Chemistry and Physics as well as provided computer labs for Computer Science and Mathematics.

<< Back to Completed Projects

<< Back to Building List

Building No:

Arts - 026/027

Science 2 - 037

GSF / ASF:

Arts Building:

58,839 / 25,146

Science 2:

71,879 / 36,095

Project Costs:

$24,000,000 (Shared Construction Cost with Arts Building)

Funding Source:

State and Auxillary Funds

Completion:

April 2003

LEED Certification:

N/A

Owner:

CSU Trustees

Architect:

Contractor:

Allgrine General Contractor, Inc.