Academic Hall Elevator Addition

Project completed in April 2004

The Academic Hall Elevator Addition project provided a second elevator to Academic Hall Building.

 

The rear side of Academic Hall before construction began.  

        

Campus Photo

 

 

The structure for the foundation is formed so that the concrete can be poured.

 

Campus Photo

 

 

The shape of the new elevator shaft is taking form and the door to the 2nd floor entrance was relocated to the end of the building (bottom-right of picture).

Campus Photo

 

 