The
Academic Hall Elevator Addition project provided a second elevator to
Academic Hall Building.
The rear side of Academic Hall before construction began.
The structure for the foundation is formed so that the concrete can be
poured.
The shape of the
new elevator shaft is taking form and the door to the 2nd floor entrance was
relocated to the end of the building (bottom-right of picture).
"Becoming nationally recognized leaders
in higher ed administration"