Arts Building

Initial drawings/models -
Front,
Side,
Color
Sketch 1,
2,
3
Construction Pictures - Phase 1 -
1,
2,
3,
4,
5,
6
|
These buildings (26,27) will hold Fine Arts labs and studios, classrooms
and one computer lab. There will be a total of 17 faculty offices.
Construction began on May 26, 2000.
Special Features - 150 seat theatre, 250 seat lecture hall
Date the Building was Occupied:
Fall 2002
Gross Square Footage - 44,000
Assignable Square Footage - 28,730