2007/2008 Minor Capital Projects
 
Project Title Location ADA Costs Proj Type Begin Design Start Const Comp Project Initial Request Description
McMahan House Pedestrian Access McMahan House $100,000 ADA2 Oct-2007 Oct-2008 Jan-2009 $100,000 Provide pedestrian access from parking lots A-C to McMahan House.
Power Assisted Operators Craven Hall $67,000 ADA2 Complete Jul-2008 Jun-2009 $67,000 Install door operators in buildings throughout the campus that are not outfitted with these.
Install Dual Glazing windows Craven Hall $0 CD       $155,000 Install Lighting Controls/Occupancy sensor in the balance of Craven Hall - approximately 180 locations, thus reducing energy costs for the campus.
Campus Signage Program Campus $0 ADA2 Jan-2008 Jun-2008 Jun-2009 $23,000 Develop a Campus Signage Master Plan to implement signage throughout campus for direction/wayfinding/accessible path.
               
 
 